Description
Save setup time and ensure a clean installation from the start. When you add this service to your order, we assemble your complete Industrial Line system before shipping: all slide-in units and Blanking Panels IL are mounted in the Basic Housing IL, PAB connections are wired between devices, and any GHL Logo Frontpanel IL or GHL Control Pad IL is connected if included in your order.
This variant is for systems that include a KH Director IL or ION Director IL. In addition to the standard assembly work, we install the complete tubing for the Director.
Note: Power supplies are not pre-connected — the appropriate power supply for each device must be connected by the customer after delivery.


